The disaster recovery node rack: Dell EMC hosts, NetApp storage and fibre optic cabling

Home › Case studies › Disaster recovery in healthcare: a hyperconverged node in three days

Disaster recovery in healthcare: a hyperconverged node in three days

A complete disaster recovery node for a healthcare facility: replicated hosts, NetApp storage, 100 Gbit/s stacked switches and MTP fibre optics, put into production in three days while the facility kept working.

  • Healthcare
  • 3 daysfrom dismantling the old node to production
  • 100 Gbit/sstacked switches for hosts and storage
  • MTPmulti-fibre optics for high-density links
  • 2healthcare facilities delivered with the same design

The challenge

A healthcare facility needed to renew its disaster recovery node: the site that, if the main system fails or is attacked, makes it possible to restart services and recover data.

The old node had to be dismantled and the new one put into production without ever stopping operations: in a healthcare facility information systems run day and night, and every interruption affects staff and patients.

The solution

On behalf of a partner system integrator we built the complete physical infrastructure of the new node:

  • Orderly dismantling of the old node and fit-out of the new rack
  • Dell EMC virtualisation hosts in a hyperconverged architecture, with virtual machines replicated from the main site
  • NetApp storage for data and replicas
  • 100 Gbit/s stacked switches connecting hosts and storage
  • Fibre optic links with MTP/MPO multi-fibre connectors, for maximum density and speed
  • Tidy, labelled and documented cabling

The result

The new node went into production in three days, with the healthcare facility always operational: critical services now have a copy ready to restart on a modern, fast and easy-to-manage infrastructure.

The same design was delivered at a second healthcare facility, with the same timing and the same care.

Our strength

Working into the night, so healthcare never stops

We organised the work around the facility's rhythms: dismantling the old node and starting the new one were planned with the system integrator and the facility's technicians, working into the night in the windows with the least impact.

In three days the node was in production, keeping the impact on wards and patients to a minimum.

The project in pictures
The disaster recovery node rack: Dell EMC hosts, NetApp storage and fibre optic cabling
The disaster recovery node rack: Dell EMC hosts, NetApp storage and fibre optic cabling
The completed node in the healthcare facility's server room
The completed node in the healthcare facility's server room
Services involved

Planning a similar project?

A site survey with no obligation to understand your spaces, needs and existing systems.

Call Site survey

We'll call you back

Leave your name and number: we will call you during office hours to understand what you need, with no obligation.